Update 6/13/15 – The trash rack cleaning is complete.  The racks are completely cleaned from top to bottom and about 20’ upstream from the powerhouse.  The temporary berm has been removed and the shoreline re rip rapped with this material.  The safety fence was reinstalled on Thursday.  One additional load of debris is being removed today that was piled up on shore from the removal.  Once that is done, the site will be cleaned up, driveway leveled off, and yard cleaned up and leveled from the equipment moving over it.